gigafibre-fsm/docs
louispaulb e50ea88c08 feat: unify vision on Gemini + port field tech scan/device into /j
- Invoice OCR migrated from Ollama (GPU-bound, local) to Gemini 2.5
  Flash via new targo-hub /vision/invoice endpoint with responseSchema
  enforcement. Ops VM no longer needs a GPU.
- Ops /j/* now has full camera scanner (TechScanPage) ported from
  apps/field with 8s timeout + offline queue + auto-link to Dispatch
  Job context on serial/barcode/MAC 3-tier lookup.
- New TechDevicePage reached via /j/device/:serial showing every
  ERPNext entity related to a scanned device: Service Equipment,
  Customer, Service Location, active Subscription, open Issues,
  upcoming Dispatch Jobs, OLT info.
- New docs/VISION_AND_OCR.md (full pipeline + §10 relationship graph
  + §8.1 secrets/rotation policy). Cross-linked from ARCHITECTURE,
  ROADMAP, HANDOFF, README.
- Nginx /ollama/ proxy blocks removed from both ops + field.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-04-22 11:26:01 -04:00
..
archive feat: flow editor, Gemini QR scanner with offline queue, dispatch planning v2 2026-04-22 10:44:17 -04:00
assets feat: flow editor, Gemini QR scanner with offline queue, dispatch planning v2 2026-04-22 10:44:17 -04:00
legacy-wizard feat: flow editor, Gemini QR scanner with offline queue, dispatch planning v2 2026-04-22 10:44:17 -04:00
APP_DESIGN_GUIDELINES.md feat: flow editor, Gemini QR scanner with offline queue, dispatch planning v2 2026-04-22 10:44:17 -04:00
ARCHITECTURE.md feat: unify vision on Gemini + port field tech scan/device into /j 2026-04-22 11:26:01 -04:00
BILLING_AND_PAYMENTS.md feat: flow editor, Gemini QR scanner with offline queue, dispatch planning v2 2026-04-22 10:44:17 -04:00
build-billing-pptx.js feat: flow editor, Gemini QR scanner with offline queue, dispatch planning v2 2026-04-22 10:44:17 -04:00
build-pptx.js refactor: reduce token count, DRY code, consolidate docs 2026-04-13 08:39:58 -04:00
CPE_MANAGEMENT.md feat: flow editor, Gemini QR scanner with offline queue, dispatch planning v2 2026-04-22 10:44:17 -04:00
DATA_AND_FLOWS.md feat: flow editor, Gemini QR scanner with offline queue, dispatch planning v2 2026-04-22 10:44:17 -04:00
ERPNEXT_ITEM_DIFF_VS_LEGACY.md feat: flow editor, Gemini QR scanner with offline queue, dispatch planning v2 2026-04-22 10:44:17 -04:00
FLOW_EDITOR_ARCHITECTURE.md feat: flow editor, Gemini QR scanner with offline queue, dispatch planning v2 2026-04-22 10:44:17 -04:00
Gigafibre-Billing-Handoff.pptx feat: flow editor, Gemini QR scanner with offline queue, dispatch planning v2 2026-04-22 10:44:17 -04:00
Gigafibre-FSM-Features.pptx refactor: reduce token count, DRY code, consolidate docs 2026-04-13 08:39:58 -04:00
HANDOFF.md feat: unify vision on Gemini + port field tech scan/device into /j 2026-04-22 11:26:01 -04:00
package-lock.json refactor: reduce token count, DRY code, consolidate docs 2026-04-13 08:39:58 -04:00
package.json refactor: reduce token count, DRY code, consolidate docs 2026-04-13 08:39:58 -04:00
ROADMAP.md feat: unify vision on Gemini + port field tech scan/device into /j 2026-04-22 11:26:01 -04:00
STATUS_2026-04-18.md feat: flow editor, Gemini QR scanner with offline queue, dispatch planning v2 2026-04-22 10:44:17 -04:00
STATUS_2026-04-18b.md feat: flow editor, Gemini QR scanner with offline queue, dispatch planning v2 2026-04-22 10:44:17 -04:00
STATUS_2026-04-19.md feat: flow editor, Gemini QR scanner with offline queue, dispatch planning v2 2026-04-22 10:44:17 -04:00
VISION_AND_OCR.md feat: unify vision on Gemini + port field tech scan/device into /j 2026-04-22 11:26:01 -04:00