gigafibre-fsm/services
louispaulb d9215a20fa fix(dispatch): optimize by default; per-day occupation (not 16h); balance >100% capped 120%; medium=amber
- default strategy = optimize → the FIRST Générer runs the VRP (real
  techs, no more greedy placeholders on first attempt).
- occupation bar is now PER-DAY (worst day), so a 2-day window shows /8h
  not /16h; overload shows in red.
- solver: each vehicle may go up to +20% overtime (≈120% cap, hard) but
  time past the nominal shift is soft-penalized → overflow spreads to
  techs still under 100% before anyone does overtime. Verified: 20 jobs /
  2 techs → 9h+9h (balanced, ≤9.6h), overflow dropped; under capacity it
  still concentrates (no forced equalization).
- priority medium flag = amber (yellow/orange) per request.

Verified live: default optimize on, 16 real techs / 0 placeholders,
per-day /8h occupation, none over, medium flag amber.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-02 17:39:45 -04:00
..
cogeco-checker fix(cogeco-checker): disable browser cache to rule it out as 401 cause 2026-06-01 21:47:19 -04:00
docuseal refactor: major cleanup — remove dead dispatch app, commit all backend code, extract client composables 2026-04-08 17:38:38 -04:00
email-editor feat(email-editor): persist easy-email JSON state for instant restore on reload 2026-05-22 06:04:48 -04:00
legacy-bridge feat(fsm): platform build — comms UI, F→ERPNext sync/billing, roster, campaigns, network, reports 2026-06-15 06:12:12 -04:00
legacy-db refactor: major cleanup — remove dead dispatch app, commit all backend code, extract client composables 2026-04-08 17:38:38 -04:00
modem-bridge feat: flow editor, Gemini QR scanner with offline queue, dispatch planning v2 2026-04-22 10:44:17 -04:00
osrm feat(dispatch): OSRM road-time matrix for the VRP optimizer (Phase 2) 2026-07-02 13:48:43 -04:00
roster-solver fix(dispatch): optimize by default; per-day occupation (not 16h); balance >100% capped 120%; medium=amber 2026-07-02 17:39:45 -04:00
targo-hub refactor(priority): unify on 3 levels (ERPNext standard), high = red, jobs + conversations 2026-07-02 16:01:25 -04:00